Legal Trades Deep Liquidated Damages Enforceability
This skill has skeleton metadata only. The full content and verification process have not run yet. It is visible in the catalog so the slot is reserved while the build-out continues.
SHA-256 content hash
Method: SHA-256 of canonical SKILL.md with LF line endings. Short form (16-char prefix of SHA-256). Full hash available after next backfill.
The verify endpoint re-reads the canonical file and compares hashes live. Any third party can reproduce by: (1) read skills/skilski-legal-trades-deep-liquidated-damages-enforceability/SKILL.md, (2) normalize line endings to LF, (3) run sha256sum.
Static-Pass tier — static checks cleared, dynamic gauntlet pending
This slug cleared the static checks: schema, frontmatter, sector assignment, and safety review. The dynamic gauntlet (sandbox, chaos, field test) has not run yet for this slug. The 14-day Material Failure refund protects the buyer until it does.
The six-phase process
Every skill listed as Top Verified has cleared all six phases. Nothing is auto-approved. Nothing skips security. Nothing in a high-stakes domain ships without a human reviewer.